Open path CDO procedures
urn:aero:airm:1.0.0:ContextualModel:ATMBusinessTerms:Open_path_CDO_procedures
Procedures which require that after the DTW, an FM path terminator should be coded. In contrast, if ATC requires a defined path, a VM path terminator can be used instead.
Source:
ICAO