SaturationCapacity
European Supplement
urn:aero:ses:eurocontrol:airm:1.0.0:ConceptualModel:Subjects:AirTrafficOperations:AerodromeOperations:SaturationCapacity
The expected (average") number of runway operations (take-offs and landings) that can be performed in one hour without violating ATC rules, assuming continuous aircraft demand."
Source:
SESAR,